Our Sponsors
October 2008 (ET)
Read More61 / 930
Haverhill: Anne Lambert, of Hilldale Ave., talks about the poor road conditions of her street. Road crew begain last week to repave the road but stoped because of the heavy rains that followed. Their are only a few construction signs posted high on poles to let drivers now to slow down. Photo by Tim Jean/Eagle-Tribune Thursday, October 02, 2008